Back to News
ImportantSourceODAILY

Lido解析NEST机制:初期采用财库模式,连接协议增长与LDO价值

Odaily星球日报讯 以太坊质押协议 Lido DAO 发文解读 NEST(Network Economic Support Tokenomics)机制,通过链上自动化方式将协议收入与 LDO 代币价值绑定,实现持续性的 LDO 回购。 NEST 是 Lido“LDO 价值对齐”战略的核心组成部分,旨在让 LDO 持有者更直接分享协议增长收益。该机制由 DAO 国库盈余资金支持,当 Lido 质押业务收入超过设定基准后,部分超额收入将通过 CoW Swap 自动兑换为 LDO。 根据 Lido DAO 设定的初始参数,NEST 收入基准为年化 4000 万美元(约每日 10.9 万美元),超额部分的 50%将用于回购 LDO,每日回购上限为 5 万美元,365 天累计上限为 1000 万美元。回购执行每日进行,采用无需许可的链上流程。 NEST 上线初期将采用“国库模式”(Treasury-only mode),购买的 LDO 将直接进入 DAO 国库。未来在市场条件合适时,DAO 可通过链上投票切换至 LP 模式,将一半资金用于购买 LDO,另一半转换为 wstETH,并提供 Curve 流动性。 Lido 表示,相较于人工定期回购、直接销毁代币或简单按收入比例分配等方案,NEST 通过智能合约和链上治理实现透明、可调整且无需人工干预的回购机制。 该机制包含多项风险控制措施,包括每日资金上限、链上治理参数调整、价格预言机保护以及紧急暂停机制等,以降低市场操纵、预言机攻击和协议收入波动带来的风险。 此前基于 2024 年至 2025 年收入数据的回测显示,NEST 模型预计可执行约 709 万美元的 LDO 回购,与目标支出规模一致。Lido 表示,未来 DAO 可根据协议经济变化,通过链上投票调整相关参数。
Disclaimer: The views above are the author's only and do not represent 711BTC. Nothing here constitutes investment advice.

Related

07-08 11:00

Binance will support the Metal DAO (MTL) network upgrade and hard fork.

PANews reported on July 8th that, according to an official announcement, Binance plans to suspend token deposits and withdrawals on the Metal DAO (MTL) network at 23:00 (UTC+8) on July 8th, 2026, to support its network upgrade and hard fork. The network upgrade and hard fork are expected to take place at 00:00 (UTC+8) on July 9th, 2026.

07-03 21:52

KR1, an investor in Lido, transferred 3.7 million LDO tokens to Kraken one hour ago.

According to Odaily Odaily, based on monitoring by on-chain analyst Yu Jin, KR1 plc, a London Stock Exchange-listed digital asset technology company and an investor in Lido, transferred 3.7 million LDO tokens (US$990,000) to Kraken one hour ago.

07-02 12:42

The Sui mainnet has been upgraded to support zero-gas transaction simulation and has optimized network stability.

Odaily Odaily reports that Sui has announced mainnet upgrade to version V1.74.1, with the protocol simultaneously upgraded to version 128. Key upgrades include: support for zero-gas stablecoin transfer simulations, facilitating application testing for developers; the mainnet officially adopting a timestamp-based Epoch ending mechanism, further optimizing network efficiency; the addition of Move code static analysis functionality to help developers improve code quality; and optimizations to the validator node connection mechanism and node restart stability, reducing abnormal crashes. Furthermore, this upgrade improves range proof verification, cryptographic performance, and Binary Pools-related protocol mechanisms, providing support for future feature expansions.

06-29 15:07

AI economic infrastructure provider Astarter announced that it has received strategic support from institutions such as Vega Ventures and UZ Capital.

According to Mars Finance, on June 29th, Astarter, the autonomous AI economic infrastructure of the BNB Chain ecosystem, announced that it has received strategic support from Vega Ventures, UZ Capital, Go2Mars, BitBT Ventures, and other institutions, further strengthening its AI ecosystem layout. Astarter had previously received strategic support from EMURGO, with MH Ventures, Avstar Capital, 316VC, CRT Labs, Megala Ventures, and other institutions leading the investment. Astarter aims to build a full-stack infrastructure for AI agents on the BNB Chain, providing on-chain AI agents with their own computing power, runtime execution, on-chain settlement, and identity capabilities. Its products include the AI ​​computing power node ABox, a decentralized exchange (DEX), Launchpad, and the CORE agent layer, with AST as its native token. The Mainnet and TGE are planned to launch in the third quarter of 2026. This strategic cooperation will further promote Astarter's development in computing power networks, products, and ecosystem.

07-06 15:00

Binance will support Moonriver (MOVR) network upgrades.

PANews reported on July 6th that, according to an official announcement, Binance plans to suspend token deposits and withdrawals on the Moonriver (MOVR) network at 20:00 (UTC+8) on July 6th, 2026, to support its network upgrade. The project team will conduct the network upgrade at block height 16,960,935 (estimated at 21:00 (UTC+8) on July 6th, 2026).

07-06 11:54

Infini now supports USDT0 deposits with Conflux Network.

According to Foresight News , the AI-driven financial operating system Infini has added support for USDT0 deposits on the Conflux Network.